Grid Congestion

The grid operator says no.
Your battery says yes.

Large parts of the Netherlands are locked: no heavier connection, waiting lists of years. With battery storage you simply keep growing on your existing connection.

Schedule a consultation

Battery storage system next to rows of solar panels

The solution

More capacity, without a heavier connection.

The problem

Waiting is not a strategy.

Anyone requesting a heavier grid connection today ends up on a waiting list of several years in many regions. Meanwhile you want to electrify: EV chargers, heat pumps, electric processes, expansion.

EV chargers for your fleet

Charge electric company vehicles without overloading your connection: the battery supplies the peak, the grid supplies the average.

Electrification of processes

From gas to electric without grid reinforcement — the battery absorbs the extra peaks your connection can’t handle.

Expanding production

More machines, more shifts, more consumption — within your existing contracted capacity.

Feed-in capacity full? Still works.

Can’t your solar power get onto the grid? Store it and use or trade it later, instead of being curtailed.

The solution

Smarter use of the connection you already have.

The EMS monitors your contracted capacity 24/7. If a breach is imminent, the battery steps in — automatically, within milliseconds.

Grid reinforcement needed0× — you work within your existing connection
Extra income via the imbalance marketindicatively ± € 55 per kWh of battery capacity per year
Monitoring and control24/7 automatic via smart EMS — with OTA updates
Response timeMilliseconds — your processes notice nothing

Background

What exactly is grid congestion?

The power grid is full in more and more places: demand for transport capacity is growing faster than grid operators can expand. For businesses, that concretely means: not being able to get a heavier connection — or not being allowed to feed back.

Demand grows faster than the grid

Electrification of industry, vehicle fleets, heat pumps and data centres is driving demand. Grid reinforcement takes years: permits, personnel and materials are scarce. Large parts of the Netherlands are marked orange or red on the congestion map.

Waiting lists at the grid operator

Anyone requesting a heavier connection or more transport capacity from Liander, Enexis or Stedin ends up on a waiting list in congestion areas — often for several years. Meanwhile, your growth is on hold.

Feed-in is full too

Congestion works both ways. In many regions, solar rooftops can no longer feed their power back: new feed-in capacity is refused or existing capacity is limited. Generated power you can’t use is a loss.

Battery as your own buffer

A business battery decouples your consumption and generation from the moment of transport. You use your connection to the maximum within existing limits — and keep growing without waiting for the grid operator.

Terminology

The terms you’ll come across, explained.

The same terms keep coming up in conversations with your grid operator. Here’s what they mean — and how battery storage addresses them.

Contracted transport capacity (GTV)The maximum capacity (kW) agreed with your grid operator. The battery automatically keeps you under it — and enables expansion within your GTV.
Congestion managementScheme where the grid operator pays you to use less grid capacity at peak times. With a battery you can participate without adjusting your operations.
Non-firm ATO / flexible contractConnection with limited transport certainty at lower cost. Combined with storage, often the route to getting connected quickly.
Curtailment / feed-in limitationMandatory shutdown of your solar power at peak times. With storage you don’t curtail, you store — and sell later.
Quarter-hour peakYour highest average draw per 15 minutes — decisive for your grid costs. Peak shaving reduces exactly this value.

Frequently asked questions about grid congestion

Can I expand without a heavier grid connection?

In most cases: yes. The battery supplies the peaks your connection can’t handle — EV chargers, electric processes, extra production. Based on your quarter-hour data, we calculate how much extra capacity you can free up within your existing connection.

I’m no longer allowed to feed back. Does solar still make sense?

Especially then. You store your generation and use or trade it when it’s possible and profitable. That way your PV installation keeps delivering returns, even with a feed-in limitation from the grid operator.

How quickly can a battery be installed?

Considerably faster than grid reinforcement. Systems up to about 230 kWh are delivered from EU stock and are usually installed within a few weeks — installation itself takes 1–2 days. Container projects are scheduled per project.

Do I need permission from the grid operator?

A battery behind your existing connection doesn’t require a heavier connection. A notification requirement to your grid operator does apply; our installation partners handle the registration and grid coupling in accordance with EN 50549.

Can I participate in congestion management and earn from it?

Yes. With a controllable battery, you’re an attractive flexibility partner for your grid operator. Compensation varies by region and contract; we cover the possibilities during the consultation.

Stuck on the grid operator’s waiting list?

Send us your situation. We’ll calculate whether storage enables your expansion — and what it delivers.

Schedule a consultationView the systems ›

Zakelijkebatterij.eu
Privacyoverzicht

Deze site maakt gebruik van cookies, zodat wij je de best mogelijke gebruikerservaring kunnen bieden. Cookie-informatie wordt opgeslagen in je browser en voert functies uit zoals het herkennen wanneer je terugkeert naar onze site en helpt ons team om te begrijpen welke delen van de site je het meest interessant en nuttig vindt.